Sealed bids for the construction of the SOUTHERN INDUSTRIAL DRIVE ROADWAY IMPROVEMENTS PROJECT will be received by the NEW RIVER GORGE REGIONAL DEVELOPMENT AUTHORITY (NRGRDA), at 200 Main Street, Beckley WV, until close of business on July 18, 2025, via email to jbelcher@nrgrda.org .
Construction of approximately 3,100 linear feet of industrial access roadway, including full-depth asphalt pavement (base, intermediate, and wearing courses), aggregate base course, storm drainage systems, ditch line construction, excavation, grading, stabilization, striping, and signage. Work also includes furnishing all labor, materials, equipment, services, and operations required as specified in the plans and specifications.
Bidding documents, including specifications and drawings, are available electronically at https://bit.ly/SouthernRFP.
An optional pre-bid conference will be held on-site at 10:00 a.m. on July 8, 2025.
This project will be administered by the NEW RIVER GORGE REGIONAL DEVELOPMENT AUTHORITY in cooperation with the West Virginia Department of Highways. The final roadway, upon completion, will be owned and maintained by the WVDOH.
The total project contract will be negotiated based on Unit-Price quantity. Bidder understands that if the cumulative quantity accepted and measured for payment for any unit-price item exceeds [110 %] of the estimated quantity, the Contractor shall not proceed with additional Work on that item beyond such threshold until the Project Manager, and Engineer/Architect have: a. reviewed the circumstances of the overrun; and b. executed a Change Order establishing (i) an adjusted or new unit price, or (ii) other equitable compensation for quantities in excess of [110 %].
All bids must be accompanied by a bid bond in the amount of five percent (5%) of the bid.
The successful bidder must (a) provide a dual obligee performance bond in favor of NRGRDA and Copart of Connecticut, Inc., and (b) execute and deliver a Consent to the Collateral Assignment of Contracts in the form provided as part of the Bidding Documents.
Bidding Documents may be downloaded from the designated website. The designated
website will be updated periodically with addenda, lists of registered plan holders, reports, and other information relevant to submitting a Bid for the Project. All official notifications, addenda, and other Bidding Documents will be offered only through the designated website. Neither Owner nor Engineer will be responsible for Bidding Documents, including addenda, if any, obtained from sources other than the designated website.
CENTEC Engineering
3757 Robert C Byrd Drive
Beckley, WV 25801
All applicable federal, state, and local regulations shall apply. Bidders must comply with the requirements of West Virginia Code §5G relating to procurement of construction services.
The NRGRDA reserves the right to reject any and all bids and to waive any informalities in the bidding process.
By order of:
Jina Belcher, Executive Director
New River Gorge Regional Development Authority
Periodically, we like to share information on new developments and events with our subscribers. Sign up today!
By signing up, you accept the Privacy Policy and Terms of Use of the NRGRDA website and agree to receive email notifications, news, offers, and marketing promotions from NRGRDA and/or its affiliates and partners.
Periodically, we like to share information on new developments and events with our subscribers. Sign up today!
By submitting your email address and clicking the “Sign Up” button, you accept the Privacy Policy and Terms of Use of the NRGRDA website and agree to receive email notifications, news, offers, and marketing promotions from NRGRDA and/or its affiliates and partners.
Notice and Disclaimer: Material on this website is protected by copyright and trademark laws. The information contained in this website or linked sites is provided on an “as is” basis. We make no guarantee or representation about the accuracy or completeness of the information, and disclaim all warranties, express or implied, including but not limited to warranties of merchantability, fitness for a particular purpose and non-infringement. We are not responsible for any damages arising from the use of information on this site. It is your responsibility to independently investigate accuracy and completeness OF ALL INFORMATION, and to determine to your satisfaction the suitability of ANY SELECTED propertY for your needs. Any projections, opinions, assumptions or estimates used are for example only and MAY not represent current or future performance of any property.